The firestone epdm fully adhered system is a lightweight system with outstanding design flexibility it is suitable for contoured roofs roofs with irregular shape and any roof with limited load bearing capacity provided the substrate is compatible with firestone contact adhesives and provides sufficient adhesion.
Fully adhered roll roofing.
Then the perimeter of the second roll is cleaned.
Similar to mechanically fastened roof systems the rolls in a fully adhered roof system are bonded together based on the roof system type.
This requires the 4 x8 insulation boards to serve the dual role of insulating and securing the roof to the metal deck which requires far more screws.
It is fully adhered with a cold adhesive spread over the underlayment or secured by heating in place with a propane torch.
This product may not be.
For example in a fully adhered epdm roof system after the first roll is glued down the second roll of membrane is rolled out next to the first roll.
The membranes are then heat welded together using a hot air gun to create a watertight seal.
The insulation boards both insulate and secure the roof to the metal deck.
Your roofing surface will be completely flat and waterproof with no gaps.
Roll roofing and modified bitumen are both suitable for low slope roofs.
Firestone fully adhered system fas application.
Roofs that are fully adhered are glued directly to the insulation below.
The weatherbond epdm fully adhered system will adhere to wood metal plastic glass fi berglass rubber m asonry brick smooth surface built up roofs non granular roll roofi ng non granular half lap roofi ng painted surfaces wood fi berboard lightweight concrete and polyisocyanurate.
Modified bitumen is approved for flat roofs with minimal slope but roll roofing is not viable below a 2 12.